Bens Murphy Rebel Building:
Garage Make-over (getting ready)
Front Spar to Root Rib
Solid Flush Riveting wing skins
Match drilling wing skins to ribs
C Fuel tank bulkheads
D wing inspection holes and priming inside
E Pre-close last pics
F LE section complete
G Bottom fuel tank and wing skin attach
10.05 nutplates aileron hinge attach
March06 Update ...long time, no web
April06
Summer06. Limited building. Aft fuselage subfloor
Fall06. Inside aft fuselage, lexan templates for inside corner wraps
Fall06 #2. Tail area: Fus-29 fix, Fin fit, Fus-30 fab
Jan-Jun 2007
Forward Cabin (Fall07)
Feb - May 08: Door frames (flush riveting)
,
Cabin Roof
,
Top Corner Wraps
Aug 08: Bottom Corner Wraps, moving on to Floor Channels
Fall 08 - Feb 09: Cage Posts forward to Firewall
Summer 09 update -- Forward fuselage, lower front corner wraps
...out cutting aluminum.
Someday - Nice Lookin Ones
A few fun Rebel landing videos
Back